Building permits are issued by the Groveland Building Department, and we file them on our own Home Improvement Contractor registration. That is not a formality. Under M.G.L. c.142A a homeowner who takes the permit out in their own name is excluded from the Guaranty Fund, the state programme that can pay up to $25,000 against an unpaid judgment. If a contractor asks you to pull the permit yourself, they are asking you to give up that protection for the whole job.
Groveland Construction Questions
Possibly, and it is the question that most often changes a project. Homes outside the sewered area run on septic, and a Title 5 septic design fixes the number of bedrooms the property is permitted. If your addition adds a bedroom and the existing system is already at its rated count, the system has to be upgraded to match.
We check the septic design against your plans at the walkthrough, because the upgrade can cost more than the room itself and it is far better known at the start.
Usually, though the honest answer is often that adding to the footprint is the wrong move. The tenements and boarding houses around Salem and Washington Streets sit on tight lots, close to their neighbours.
More often the space is already there and unused: a half-storey attic, a compartmented ground floor, an unheated rear ell. Reclaiming that is cheaper and faster than building outward, and it does not touch the setbacks.
We do, on our own Home Improvement Contractor registration. Under M.G.L. c.142A a homeowner who pulls their own permit is excluded from the Guaranty Fund, which can pay up to $25,000 against an unpaid judgment against a contractor.
Any contractor asking you to take the permit out in your own name is asking you to give up that protection for the entire project. Treat it as a warning sign.
Two, and they are not interchangeable. Home Improvement Contractor registration covers remodeling work on an existing one- to four-unit owner-occupied home. A Construction Supervisor Licence is a separate credential under M.G.L. c.112, and it is what structural work and new dwellings require.
Ask for both numbers and check them on the state register before you sign anything. Ours are MA HIC #205899 and MA CSL #117142.
It depends where the work sits. Groveland has Merrimack River frontage and Johnson’s Creek running through it, and work within the buffer of a mapped wetland or bank generally needs a filing with the Conservation Commission before a building permit can issue.
That adds weeks to a programme rather than days, so we establish it at the walkthrough and build it into the schedule rather than discovering it later.
Yes. The centre and the older river village around King and Main Streets include early framing that behaves nothing like modern stick construction.
We open up and confirm the load paths before committing to a layout, which occasionally changes the design. It is a great deal cheaper to find a carrying beam at survey stage than once a wall is already out.